2019 World-Record 19 m Bridge Jacking – Podilsko-Voskresensky Bridge
Infrastructure · SPETSPROEKT-INVEST LLC

World-Record 19 m Bridge Jacking – Podilsko-Voskresensky Bridge

Engineered and executed the world-record 19-metre jacking of a 750-tonne pre-assembled bridge section using four synchronized JS500 towers and SPMTs, enabling precision installation on Kyiv's Podilsko-Voskresensky Bridge.

BridgeHydraulic jackingWorld record
Case study
2019 Rapid SPMT bridge replacement
Infrastructure · DELTABUDGROUP LLC

Rapid SPMT bridge replacement

Fast-track replacement of bridge spans at one of Kyiv's busiest interchanges using synchronized JS500 jacking systems and SPMTs, minimizing traffic disruption while safely removing old concrete spans and installing new steel structures.

BridgeRapid replacementSPMT
Case study
2019 Orlivka Wind Farm – 26 Vestas V136 Turbines
Renewable Energy · Vestas

Orlivka Wind Farm – 26 Vestas V136 Turbines

Construction of a 26-turbine Vestas wind farm in Orlivka, including heavy lifting, tower erection, nacelle installation and blade assembly using a fleet of crawler and mobile cranes under demanding site conditions.

Wind energy
Case study
2020 Blast Furnace No. 6 Modernisation – 1,600 t Ring Crane Deployment
Steel & Mining · Metinvest (Zaporizhstal)

Blast Furnace No. 6 Modernisation – 1,600 t Ring Crane Deployment

Deployment of a 1,600-tonne ring crane to replace major Blast Furnace No. 6 modules inside an operating steel plant, enabling heavy lifts within a highly constrained industrial environment while maintaining safe execution.

Hydraulic gantryIndustrial installationSteel plant
Case study
2025 350 t Generator Stator Heavy-Lift Engineering for Nuclear Power Plant Modernization
Nuclear Power Generation · Energoatom

350 t Generator Stator Heavy-Lift Engineering for Nuclear Power Plant Modernization

Heavy-lift engineering studies for the modernisation of generator stators weighing up to 350 tonnes, including lifting concepts, transport engineering, and installation methodologies supporting nuclear power plant modernization.

Engineering studyHeavy equipmentPower generation
Engineering study
2019 Hydraulic lifting system positioning heavy industrial machinery
Steel & Mining · Metinvest Group

Roughing Mill Installation – Hot Strip Mill 1700 Modernisation

Engineered lifting and precision installation of a fully assembled 640-tonne Roughing Mill inside an operating steel plant using a Mammoet SBL1100 Hydraulic Gantry System.

Industrial liftingProduction supportSteelmaking
Project Reference
2014 Construction of the New Safe Confinement arch at Chornobyl
Nuclear Infrastructure · Novarka

New Safe Confinement Arch – Strand Jack Lifting

Engineered and executed the synchronized lifting of the 15,500-tonne New Safe Confinement arch using 56 strand jacks, custom lifting towers and bespoke control systems during the construction of Chernobyl's landmark nuclear containment structure.

Engineered liftHeavy liftingNuclear infrastructure
Case study
2019 Drive Motor & Mill Stand Installation – Hot Strip Mill 1700 Modernisation
Steel & Mining · Metinvest Group

Drive Motor & Mill Stand Installation – Hot Strip Mill 1700 Modernisation

Engineered heavy lifting for the first phase of Hot Strip Mill 1700 reconstruction, installing two 140-tonne drive motors and four 90-tonne mill stands with millimetre precision using hydraulic gantry technology.

Industrial liftingProduction supportSteelmaking
Project Reference
2016 New Safe Confinement Arch – Heavy Skidding Operation
Nuclear Infrastructure · Novarka

New Safe Confinement Arch – Heavy Skidding Operation

Engineered and executed the final 330-metre skidding of the 36,200-tonne New Safe Confinement using a bespoke 116-shoe hydraulic skidding system, safely positioning the world's largest land-based movable structure over Reactor No. 4 at Chernobyl.

Engineered liftHeavy liftingNuclear infrastructure
Case study
2018 130 t Rotor Conditioner Replacement – Bunge Processing Facility
Industrial Manufacturing · Bunge

130 t Rotor Conditioner Replacement – Bunge Processing Facility

Replacement of a 130-tonne rotor conditioner at Bunge's Mykolaiv processing facility using hydraulic jacking, skidding systems and SPMTs to safely extract, transport and install critical production equipment.

Heavy equipmentHydraulic jackingIndustrial installation
Case study
2018–2019 Novotroitsk Wind Farm – Vestas 4.2 MW Wind Turbine Installation
Renewable Energy · Vestas

Novotroitsk Wind Farm – Vestas 4.2 MW Wind Turbine Installation

Installation of Vestas 4.2 MW wind turbines at the Novotroitsk Wind Farm using two 600-tonne crawler cranes, supporting the construction of one of Ukraine's large-scale renewable energy projects.

InstallationPower generationWind energy
Case study
2018–2019 Overyanivka Wind Farm – Vestas 3.45 MW Wind Turbine Installation
Renewable Energy · Vestas

Overyanivka Wind Farm – Vestas 3.45 MW Wind Turbine Installation

Installation of Vestas 3.45 MW wind turbines at the Overyanivka Wind Farm using a dual 600-tonne crawler crane fleet, supporting the expansion of renewable energy generation in southern Ukraine.

InstallationPower generationWind energy
Case study
2019 Prymorsk Wind Farm – GE 3.8 MW Wind Turbine Installation
Renewable Energy · GE Renewable Energy

Prymorsk Wind Farm – GE 3.8 MW Wind Turbine Installation

Installation of GE 3.8 MW wind turbines at the Prymorsk Wind Farm using a 600-tonne crawler crane, delivering precision assembly of complete turbine structures for one of Ukraine's major renewable energy developments.

InstallationPower generationWind energy
Case study
2013 450 t Cold Box Installation – Metinvest Enakievo Steel Plant
Industrial Plants · Air Liquide Global E&C Solutions

450 t Cold Box Installation – Metinvest Enakievo Steel Plant

Installation of two 450-tonne cold boxes at Metinvest Enakievo using a 1,250-tonne CC6800 ring crawler crane, supported by international heavy transport and coordinated multi-crane operations.

Engineered liftHeavy liftingInstallation
Case study
2013 International STS Crane Relocation – Rotterdam to Yuzhnyi Port
Ports & Marine · TIS Group

International STS Crane Relocation – Rotterdam to Yuzhnyi Port

International relocation of two 750-tonne ship-to-shore container cranes from Rotterdam to Yuzhnyi Port using self-propelled modular transporters, supporting the expansion of one of Ukraine's largest container terminals.

Transport
Case study
2020 750 t Bridge Section Installation – Podilsko-Voskresensky Bridge
Infrastructure & Bridges · Spetsproject-Invest LLC

750 t Bridge Section Installation – Podilsko-Voskresensky Bridge

Installation of a 750-tonne preassembled bridge section for the Podilsko-Voskresensky Bridge using synchronized jacking, SPMT transport, and heavy crawler crane support to position the structure at its final elevation.

BridgeInstallationSPMT
Case study
2019 Bridge Section Relocation – Beresteiskyi Interchange
Infrastructure & Bridges · DBG

Bridge Section Relocation – Beresteiskyi Interchange

Relocation of the first bridge section at the Beresteiskyi (Shuliavskyi) Interchange using hydraulic lifting systems and SPMTs to transport the structure across one of Kyiv's busiest highways.

BridgeHeavy liftingSPMT
Case study
2019 363 t Bridge Span Installation – Beresteiskyi Interchange
Infrastructure & Bridges · DBG

363 t Bridge Span Installation – Beresteiskyi Interchange

Installation of a 363-tonne bridge section using synchronized hydraulic jacking, JS500 lifting systems and SPMTs during the reconstruction of Kyiv's Beresteiskyi Interchange.

BridgeHeavy liftingHydraulic jacking
Case study
2014 Port Crane Assembly & Heavy Lift Operations – Port of Odesa
Ports & Marine · International Terminal Project

Port Crane Assembly & Heavy Lift Operations – Port of Odesa

Assembly of port cranes at Odesa Port during one of Ukraine's most challenging periods, delivering safe project execution, international workforce coordination and successful equipment evacuation under rapidly changing conditions.

Crawler cranesEngineered liftHeavy equipment
Case study
2019 Process Mill Replacement Using SPMTs – Odesa Cement Plant
Industrial Plants · KBK

Process Mill Replacement Using SPMTs – Odesa Cement Plant

Replacement of a process mill at the Odesa Cement Plant using self-propelled modular transporters (SPMTs), enabling the removal of the existing mill and installation of a new unit within a confined production building.

Engineered liftHeavy equipmentIndustrial installation
Case study

Need proof for a specific sector? We can prepare a focused credentials package

Portfolio information is structured around the decision you need to make: delivery capability, sector relevance, technology fit or partner qualification.

Share the asset type, country, project stage and required scope. We will return the most relevant case material available.