Heavy Lifting
Cranes up to 600t, jacking systems up to 2,000t and hydraulic gantries for precise operations.
Explore service →Engineering · Heavy lifting · Heavy transport
20+ years of experience in construction and logistics. International standards. Transparent execution
Phenyx Rebuild carries forward the heavy-lift discipline, field culture and partner trust developed through Mammoet Ukraine experience
Read the story →Engineering, equipment import, logistics and field execution combined into one accountable delivery chain
Cranes up to 600t, jacking systems up to 2,000t and hydraulic gantries for precise operations.
Explore service →SPMT, multi-axle trailers, route studies, permits and final positioning at site.
Explore service →EU equipment import, logistics, customs brokerage and site delivery, including 300t+ equipment delivered since 2025.
Explore service →Mechanical installation, assembly, alignment and start-up testing on complex industrial and energy sites.
Explore service →Equipment interfaces, punch lists, commissioning support and handover readiness managed with field teams.
Explore service →Design, procurement, transport, installation and handover managed through one accountable delivery team.
Explore service →Wind turbine components lifted. 100+ WTGs installed across southern wind farms with 3× 600t cranes and a 20+ crew.
Confinement Arch lifted over Chornobyl Reactor 4 — largest moveable land-based structure ever built. Plus a 350t stator handling study for NPP modernisation.
750t bridge span lifted to 19m — world-record jacking height, Kyiv.
780t equipment jacked and installed at Ilyich Steel Plant, Mariupol.
Selected operations across nuclear, infrastructure, renewable energy and heavy industry
Replacement of a process mill at the Odesa Cement Plant using self-propelled modular transporters (SPMTs), enabling the removal of the existing mill and installation of a new unit within a confined production building.
Case study
Assembly of port cranes at Odesa Port during one of Ukraine's most challenging periods, delivering safe project execution, international workforce coordination and successful equipment evacuation under rapidly changing conditions.
Case study
Installation of a 363-tonne bridge section using synchronized hydraulic jacking, JS500 lifting systems and SPMTs during the reconstruction of Kyiv's Beresteiskyi Interchange.
Case study
Relocation of the first bridge section at the Beresteiskyi (Shuliavskyi) Interchange using hydraulic lifting systems and SPMTs to transport the structure across one of Kyiv's busiest highways.
Case study
Installation of a 750-tonne preassembled bridge section for the Podilsko-Voskresensky Bridge using synchronized jacking, SPMT transport, and heavy crawler crane support to position the structure at its final elevation.
Case study
International relocation of two 750-tonne ship-to-shore container cranes from Rotterdam to Yuzhnyi Port using self-propelled modular transporters, supporting the expansion of one of Ukraine's largest container terminals.
Case studyWe connect proven European equipment and engineering with the field capability required to rebuild energy, industry and infrastructure
Every project is designed to leave more than an installed asset: safer operations, stronger local capability and infrastructure that keeps working
Share the asset, site and timing. Our team will respond with the right engineering, equipment and next step