The modernisation of Blast Furnace No. 6 at the Zaporizhstal Steel Plant required the replacement of large furnace modules inside one of Ukraine’s busiest steel production facilities. The work had to be executed within a dense industrial environment surrounded by operating production units, pipe racks, rail infrastructure and restricted working space, where conventional heavy lifting methods could not provide the required lifting capacity or operating radius.
To meet these challenges, Mammoet engineered a lifting solution centred on one of the largest crane deployments ever undertaken in Ukraine’s steel industry.