During the winter of 2014, we supported the assembly of heavy port cranes at the Port of Odesa under exceptionally demanding operating conditions. The project combined technically complex lifting operations with severe weather, where freezing temperatures affected both equipment and site conditions. At the same time, the rapidly changing geopolitical situation in Ukraine created additional challenges for project planning, workforce coordination and logistics.
Despite these circumstances, the project remained focused on its primary objective: the safe and successful assembly of critical port infrastructure.